Calcasieu Pass LNG Project

Piping Fabrication
Object
Cryogenic piping prefabrication for LNG modules
Client
Baker Hughes
Scope of work
Prefabrication, CND, hydrostatic testing, pickling and passivation, painting, packaging and delivery to the assembly site of approximately 3,300 tonnes of process piping.
Categoria
Tecnical details

Carbon steel piping: 1,900 tonnes

Stainless steel piping: 1,400 tonnes

Welded inches: 200,000” carbon steel / 130,000” stainless steel

Square metres of paint applied: approx. 46,000 m²