Back

New small-scale LNG terminal Ravenna

Cryogenic Piping
Object
Piping prefabrication and mechanical assembly for LNG plant
Client
Edison SpA
Scope of work
K.O. drum supply, piping prefabrication, hydrostatic testing, painting, piping assembly, leak testing, drying and creating an inert atmosphere, cryogenic media assembly, torch assembly, assistance with pre-commissioning and commissioning.
Categoria
Tecnical details

Piping:  77 tonnes

Welded inches: 23,600” carbon steel / 3,000” stainless steel

Cryogenic media: 710 pcs.